Fundamentals of Sustainable and Resilient Buried Structures

mar, 07/11/2017 - 20:33
Fundamentals of Sustainable and Resilient Buried Structures
by Williams,K.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5133 - INTERNET


This paper’s objective is to introduce a design approach which improves the performance and value of buried structures. This approach involves widening the design lens to more systematically consider sustainable and resilience aspects. Owners desire sustainable transportation networks which regenerate the environment, support society, and minimize financial cost. For a transportation network to be sustainable it needs to meet the needs of current and future generations in terms economic vitality, social equity, and a healthy environment (Transportation Research Board, 2017). A sustainable transportation network is resilient and can adapt or accommodate unexpected events with minimal disruption to society (Transportation Research Board, 2017). Transportation networks lacking resilience experience disruptions, resulting in large repair costs, negative costs to the economy from disrupted travel, and expose the public to safety hazards. Agencies need resiliency to address climate change impacts on transportation systems within the context of their available resources. Buried structures, commonly referred to as buried bridges, culverts, or soil-metal structures, are structures which derive their support from composite interaction between the structure and surrounding soil. Buried structures have spans up to 40 m and are found across Canada. Buried structures have several accelerated bridge construction benefits such as an ability to be rapidly constructed, and installed costs which are typically 33% to 67% lower than traditional beam bridges (AFS40, 2013).This paper will provide insight into where buried structures provide value compared to traditional beam bridges, and practical approaches which increase the likelihood of a buried structure design that: Is better able to withstand the test of time and unexpected events; Minimizes financial resources; Minimizes disruption and in some instances, regenerate society and the natural environment.

Fast Track Precast Concrete Pavement Rehabilitation Pilot Project

mar, 07/11/2017 - 19:38
Fast Track Precast Concrete Pavement Rehabilitation Pilot Project
by Chan,S; Lee,W; Lane,B; Kazmierowski,T.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5132 - INTERNET


As Ontario’s highway network expands and is subjected to increasing traffic volumes, the Ministry of Transportation Ontario (MTO) is challenged to look for new and innovative solutions to preserve and maintain the highway system. The ministry has identified a few high truck traffic sections having Average Annual Daily Truck Traffic (AADTT) greater than 25,000 that are experiencing progressively early rutting failure, and a few thick asphalt pavements experiencing full depth cracking. To reduce impacts to the travelling public, these high volume highways require all major maintenance and rehabilitation works to be performed under tight nightly construction closures. The typical rehabilitation holding treatment of mill and overlay at these locations may last only 3 to 5 years, rather than the expected 8 to 12 years, before the rutting and cracking return. Based on the progressively shorter lifecycles of this holding strategy, the ministry is investigating a potentially more life cycle friendly option of using overnight precast concrete mill and inlay techniques to mitigate this progressive rutting and cracking challenge. This paper describes an MTO pilot project using precast concrete slabs to rehabilitate a deep strength flexible pavement. The paper discusses how three different slab support systems were evaluated based on factors such as load transfer and ease of construction; the challenges of construction staging based on an 8 hours work window, with adaptations of horizontal and longitudinal joint details for the anticipated temporary and permanent works; lessons learned and next steps. Furthermore, the paper presents post construction roughness, load transfer efficiency and friction results of the tined longitudinal texture on the precast slabs.

Experimental assessment of flexible pavement behaviour under freezing conditions and winter weight premiums

mar, 07/11/2017 - 18:21
Experimental assessment of flexible pavement behaviour under freezing conditions and winter weight premiums
by Cloutier,JP; Bilodeau,JP; Thiam,PM.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5131 - INTERNET


As it is well documented, structural behaviour of flexibles pavements in cold regions is significantly affected by environmental factors and traffic loads. When it comes to pavement damage, the action of freeze and thaw is one of the most important inputs to consider. During thaw, the loss of bearing capacity is addressed by the seasonal load restriction policies enforced in many countries. On the other hand, during winter, frost action induces an important increase in the bearing capacity of flexible pavements due to the viscoelastic response of asphalt concrete and to the freezing of pore water in granular materials and soils. The pavement strengthening with frost penetration has led some transportation agencies to allow winter weight premiums (WWP). Currently, the main issue related to WWP programs is the variety of legislation for both among and within jurisdictions. This variety is caused, in part, by the lack of a rational decision criterion for the application of an axle load limit increase based on the mechanical behavior of frozen pavements. The objective of this project was to document the mechanical behavior of freezing pavements and to develop a rational criterion for the onset of winter load premiums. An experimental approach with the use of Laval University full-scale heavy vehicle simulator was considered to monitor the response of two different flexible pavements built in a 24 m3 indoor test pit over a low plasticity clay and a silty sand subgrade soils, respectively. They were instrumented to monitor temperature profiles, surface deflection, as well as stress, strain and moisture content in each layer. The simulator was used to apply the air freezing temperature (-10 °C) and to periodically load the pavement surface using a standard dual-wheel set (half axle) varying in the range of 4500 to 6250 kg. The results collected allowed documenting how the response of different pavement structures changes with respect to frost penetration and temperature, and allowed quantifying the effect of the load magnitude on the change of the pavement response and damage.

Traffic Monitoring Practices Guide for Canadian Provinces and Municipalities

lun, 06/12/2017 - 13:47
Traffic Monitoring Practices Guide for Canadian Provinces and Municipalities
by Regehr,JD; Poapst,R; Rempel,G; Montufar,J; Hallenback,M.
2017.
CA6 ARH130 2017T65 - MAIN


The Traffic Monitoring Practices Guide for Canadian Provinces and Municipalities (Guide) provides the first national-level guidance on the planning, design, and implementation of traffic monitoring programs for Canadian provinces and municipalities. The primary objectives of the Guide are to promote uniformity in the approach and techniques used to deliver traffic monitoring programs in Canada and to improve the quality of the traffic data provided by these programs. The scope of the Guide encompasses all functions within a traffic monitoring program, namely: program design and evaluation, data collection, data analysis, and reporting traffic data. Separate guidance is provided for motorized and non-motorized modes. The Guide also addresses the unique issues and challenges associated with monitoring interrupted traffic flow conditions, which are common in urban environments. It is intended for use by transportation professionals involved in the planning, design, implementation, and management of traffic monitoring programs for provincial and municipal agencies in Canada. Professionals whose responsibilities involve the application of traffic data are also expected to benefit from this Guide.

Potential of road roughness data from smartphones as an input to spring weight restriction decision-making

ven, 05/12/2017 - 20:21
Potential of road roughness data from smartphones as an input to spring weight restriction decision-making
by Allaire,F; Hanson,T.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5159 - INTERNET


One challenge facing transportation agencies employing Spring Weight Restrictions (SWR) is the ability to broadly monitor the road network for critical real time changes in road strength. Some agencies employ a subjective assessment of road roughness changes as a proxy to changes in strength and the need for further weight restrictions, though the geographic scope is limited to the travel of the road supervisor. Smartphone devices have been shown to be effective and accurate mobile platforms for collecting accelerometer data that can be converted into International Roughness Index (IRI) values. These devices have the potential to expand the extent and frequency of roughness monitoring over spring thaw if instrumented on fleet vehicles or crowd-sourced. This could support the development of objective trigger values for changes in roughness that would support the decision-making by a district engineer regarding imposing additional weight restrictions or focusing strength testing. If changes in roughness could be correlated with changes in strength, it may be possible to isolate specific areas of road weakness at high speed and in real-time. This research explored the potential of using smartphones to monitor road roughness changes on 1 km sections of two proximate collector and local highways over the SWR period in New Brunswick from March 15 – May 17, 2015. IRI values were calculated from an average taken from four runs on 26 different days at a speed of 80 km/h, reduced to 60 km/h on the local highway due to excessive road heaving. IRI values doubled from baseline to peak on both sections (collector and local baseline (peak): 1.35 m/km (2.54 m/km); 3.34 m/km,(6.60 m/km)) within the first two weeks of SWR, returning to baseline values two weeks before SWR ended. Data collection twice a week would capture the majority of significant changes in IRI values between observations. The change from a baseline IRI to the peak IRI and back occurred within the SWR window, suggesting the dates were appropriate if roughness was correlated with strength. Further work should explore trigger values that initiate a protocol to respond to drastic weather changes and the relationship between road strength and IRI.

Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions

ven, 05/12/2017 - 19:43
Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions
by Worms,TD.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5158 - INTERNET


The Plessis Road Widening and Grade Separation (Underpass) at CN Redditt Subdivision was considered a Short Term City of Winnipeg (COW) project. Short Term projects have the highest priority for funding and a key driver for this project was the funding contribution by the Building Canada Fund, which was established under the 2007 Federal budget for projects from 2007 to 2014. The COW awarded the preliminary and detailed design for the Plessis Road widening and grade separation at CN Redditt Subdivision in July 2012 to AECOM Canada Ltd. (AECOM) Construction on the first of five contracts began in summer 2013 and the project was substantially complete on October 3, 2016. Two lanes were opened to traffic in October of 2015 and all remaining lanes were open by September 2016. The final project upgraded Plessis Road from a two lane undivided, road at-grade crossing, to a four lane divided grade separated facility. The roadway services an industrial area, including truck traffic from CN’s intermodal facility located south of the project along Plessis Road. The many challenges for the project included dealing with multiple stakeholders, maintaining rail traffic throughout the duration of the project and meeting a very short design and construction schedule. Major stakeholders in the area consisted of an oil pipeline valve station located on the northeast corner of the project, oil pipelines north of the CN mainline, CN double mainline track, the CN Transcona Maintenance Shops/Yard lead, the Malteurop Plant lead, Manitoba Hydro, MTS and Shaw. Design challenges included providing clearance between the roadway surface and the underside of the rail bridge, which utilized through-plate-girders to achieve the minimal profile required, given that Dugald Road was located 300 m south of the tracks. A major land drainage channel for the COW, located on the south side of Dugald Road, could not be relocated without major cost implications and could not flow into the underpass area. The existing land drainage system was at capacity and the underpass runoff required storage prior to discharging into the existing system. The end result was the successful completion of the project using alternative solutions from numerous engineering disciplines, with minimal disruption to the stakeholders involved. The increased road and rail traffic experienced the day the first two lanes opened, has proven that the project was required to meet travel demand forecasts.

Pavement Quality – The Forgotten Subject

ven, 05/12/2017 - 19:22
Pavement Quality – The Forgotten Subject
by Uzarowski,L; Rizvi,R; Maher,MLJ; Rizzo,J.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5157 - INTERNET


These days there is a lot of discussion about climate change and its impact on pavement infrastructure, including construction and performance. Green technologies, including alternative materials and recycling, and sustainable transportation also get a lot of attention. These subjects are important and the authors of this paper have written numerous papers on this. However, there is one subject that has somewhat became forgotten. This is pavement quality. It is expected that since production and paving technology is getting better, and there are advanced and innovative materials, the issue of pavement quality has been solved and does not need attention. However, the reality is just the opposite. There are alarming voices in a number of provinces and among municipalities that pavement quality has drastically decreased. It is common to hear that in the past, pavements lasted 20 years, and recently you are lucky if you get half of this, and there are examples of dramatic premature failures. Some of this may be due to excessive traffic loading or extreme climate, but these are rare cases. More frequently, the problem is that the quality is ignored and taken for granted. Pavement quality starts with pre-engineering, proper geotechnical investigation, analysis, design, appropriate specifications and quality construction. Reducing the geotechnical investigation to the bare minimum, or sometimes not doing it at all, is the first step to compromising quality. There is the same concern with pavement design, squeezing it to the minimum and assuming overly optimistic parameters. There are also numerous examples of implementing an inappropriate rehabilitation treatment. This is particularly a problem on alternative finance and procurement projects where there is less independent checking and testing. Substandard materials, inadequate design thickness and poor construction practice combine to increase risk of premature failure. Too often, Quality Assurance field and laboratory testing is reduced to the minimum or not required at all. This is particularly the case on projects where performance specifications are followed. On these projects, the contractors control themselves and QA testing is considered an unnecessary expense. But is it? Pavements that last half as long or less of what they should are very costly for tax payers. This paper includes examples of pavements where poor investigation, design and construction practice or the use of substandard materials were reflected in compromised performance. It also includes recommendations of how to address the problems based on the authors’ extensive experience in pavement and materials engineering.

Pavement Geometry in Microscale Urban Heat Islands

ven, 05/12/2017 - 18:58
Pavement Geometry in Microscale Urban Heat Islands
by Sen,S; Roesler,J.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5156 - INTERNET


The Urban Heat Island (UHI) phenomenon has been observed in hundreds of cities across the world, which have been shown to be warmer than adjacent rural areas. Within a city however, the heterogeneity and large number of variables acting simultaneously can make it difficult to understand how UHI develops at a microscale. Urban roads can have different materials and layered structures (collectively called ‘pavement geometry’) in a city and can also be positioned differently with respect to the urban form. A three-factorial analysis was performed using an uncoupled pavement-3D urban canyon model to investigate how pavement geometry, urban form, and meteorological conditions affect microscale UHI. Representative temperature data from Chicago, USA was obtained and the UHI in a simulated urban area was evaluated for the warmest and coldest hours of the year. During the warmest hour, urban form and pavement geometry could increase the microscale UHI by an additional 3 at distinct spatial locations. Whereas, during the coldest hour which included no sunlight, urban form played a more significant role to locally increasing the UHI by 1 to 1.5 . Additionally, in closed urban canyons with constricted wind flows, pavement geometry has a particularly important role to play, whereas in more open spaces, the wind flow pattern affects the UHI. Ultimately, multiple microscale UHI case studies are recommended for individual cities to factor in the large number of site-specific variables.

Automated Assessment of Sight Distance on Highways Using Mobile LiDAR Data

lun, 04/10/2017 - 20:41
Automated Assessment of Sight Distance on Highways Using Mobile LiDAR Data
by gargoum,SA; El-Basyouny,K; Sabbagh,J.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5107 - INTERNET


One of the most important elements in highway design is the sight distance available to road users. Sight distance is the visible distance required by a driver to complete a certain maneuver (e.g. coming to a complete stop). If the available sight distance is less than design requirements, the likelihood of a driver safely completing that maneuver decreases. Current methods of measuring sight distance are very difficult, labour intensive and time consuming. Existing methods to obtain sight distance information require field visits or graphic analysis of as-built drawings. This paper proposes an algorithm to automatically extract sight distance from Light Detection and Ranging (LiDAR) data by simulating observer and target points along the virtual highway. LiDAR data is first used to create a surface model of the road. Points representing observers and targets are then created along the highway of interest. ArcGIS software is then used to create lines between the observer-target pairs and obstructions blocking the sightlines are then detected in ArcGIS. A VBA algorithm is written to compute the available sight distance along each sightline. The proposed algorithm was tested on a segment on highway 36 in Alberta. The extracted information was compared to Alberta highway design guidelines and limitations were found to both stopping and passing sight distance on existing highways. It was found that minimum stopping and passing sight distance requirements were not met in two regions. In order to analyse the impacts of sight distance limitations on safety, collision records at limited sight distance locations were assessed. Fixed object collisions and animal collisions were common in those areas, indicating that sight distance limitation could have been a factor in collision occurrence. The method developed in this study could be extremely useful in timely assessment of sight distance on highways, which could, in turn, help address limitations before safety problems arise.

Application of Probabilistic Approach for Predicting Pavement Maintenance Requirement: A Case Study on Ontario Highways

lun, 04/10/2017 - 19:17
Application of Probabilistic Approach for Predicting Pavement Maintenance Requirement: A Case Study on Ontario Highways
by Jannat,GE; Tighe,SL.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5106 - INTERNET


In pavement management system (PMS), the time to maintenance is generally estimated based on the predicted condition of the pavement. A deterministic approach is applied in the PMS to estimate the time to maintenance by following the deterioration equation of performance index. However, the probabilistic approach will further estimate the probability of failure over the estimated time to maintenance. For this reason, a probabilistic approach is applied in this study to estimate the probability of failure of pavement based on both overall condition and individual distress. In this approach, the probability of failure is estimated from the distribution of the mean time to maintenance. These mean time to failure or maintenance are calculated from the overall condition of pavement in terms of the pavement condition index (PCI) when the trigger value becomes 65 or less. However, the pavement may expect failure due to any specific distress (if the target value of failure is reached for any individual distress) before reaching the PCI trigger value of failure. For this reason, the probability of failure of each specific distress is also investigated along with the overall condition of the pavement.

Innovative Funding Mechanism for Roadway Construction in Strathcona County’s Industrial Heartland Area

lun, 04/10/2017 - 18:51
Innovative Funding Mechanism for Roadway Construction in Strathcona County’s Industrial Heartland Area
by Sillers,S; Tong,B.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5105 - INTERNET


Investing in an efficient transportation system is crucial to a country's economy. While federal and provincial governments in Canada have access to income and consumption taxes, municipal governments typically rely upon property taxes, fees, and transfers from senior levels of government to fund transportation infrastructure. With modern fuel-efficient cars, alternative energy sources, and advanced technologies used in vehicles, fuel tax, as currently administered, may become a less reliable source of funding. Municipalities face a desperate need to find stable, long-term funding for vital roadway projects in an environment of increasing demands from users, downloading of responsibilities, dwindling or unreliable transfers, and reluctance from senior government to grant additional taxation powers. Municipalities have begun examining alternative funding mechanisms including local improvement taxes, development charges, user fees, tax increment financing, public-private-partnerships, and Contribution in Aid of Construction (CIAC). Strathcona County has expanded on the CIAC concept for funding infrastructure to support industrial growth in an equitable manner that manages risk and adheres to Alberta`s Municipal Government Act. Contribution in aid of construction is a condition placed on the approval of subdivision or issuance of a development permit that requires developers to enter into a development agreement with the municipality to construct or pay for the construction of particular roadways that give access to the development. Strathcona County is a specialized municipality located immediately adjacent to Edmonton, Alberta. The adoption and usage of a CIAC policy within Strathcona County's oil and gas-based economic expansion zone, the Industrial Heartland Area (IHA), has proven to be an effective, flexible, equitable and simple means of upgrading and constructing the system of local roads that satisfies the needs of industrial developers without putting undue financial burdens on industry or County taxpayers. This paper discusses the advantages and disadvantages of many different alternative funding methods available to municipal government in Alberta; describes the experience Strathcona County has gained in implementing CIAC as a funding mechanism; and demonstrates how the CIAC system functions. Although it is recognized that no single method will work in all situations, in all communities, it is hoped that important lessons are conveyed through the example given.

Stated Preference Survey for Passenger Sensitivities to Travel Costs in the Greater Toronto Hamilton Area

lun, 04/10/2017 - 18:21
Stated Preference Survey for Passenger Sensitivities to Travel Costs in the Greater Toronto Hamilton Area
by Kravis,R; Routley,M; Iacobacci,M; Huang,C; Charette,G; Noroozi,R; McGaughey,O.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5104 - INTERNET


Metrolinx conducted a stated preference survey on passenger sensitivity to transit fare, cost, and other service factors in the Greater Toronto Hamilton Area (GTHA). This project is the largest fare sensitivity survey conducted within the GTHA (3,500+ responses collected from September to October, 2016), and the first fare sensitivity study completed in the region in decades. The results include elasticities for various travel segments broken down by time of day, origin/destination, and mode of travel, enabling better forecasts of how specific groups of passengers (e.g., off-peak GO Rail users, automobile users, local transit users) might respond to changes in price and service. This work can help evaluate existing and future pricing strategies, service changes, and other projects that may affect revenue and ridership across the entire GTHA.

Review and Recommendations for Canadian LCCA Guidelines

lun, 04/10/2017 - 18:10
Review and Recommendations for Canadian LCCA Guidelines
by Moges,M; Ayed,A; Viecili,G; Abd El Halim,A.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5103 - INTERNET


Life Cycle Cost Analysis (LCCA) is an engineering tool that is used to facilitate sound investment decision-making in the management of infrastructure. Transportation agencies can use LCCA in the selection of cost-effective pavement designs, and evaluation of future maintenance, rehabilitation, and/or reconstruction strategies. Using LCCA can also increase transparency in the project selection process, ensuring agencies make strategic decisions that maximize the expected value of their investments. This paper reviews the current LCCA practices in place across transportation agencies in Canada and in select international agencies. The review focuses on the LCCA policies of the provinces of Alberta, British Columbia, Manitoba, Nova Scotia, Ontario, Quebec, and Saskatchewan. The practice guidelines of the Federal Highway Administration (FHWA), American Concrete Pavement Association (ACPA), Asphalt Pavement Alliance (APA), and the World Bank (WB) are also reviewed. The objective of the study is to develop a Canadian LCCA Standard Practice Guideline based on best practices. The guideline provides guidance on LCCA for alternate pavement-type bidding. The guideline is also instrumental in the development of user-friendly excel based tool to aid in the analysis of life cycle costs of alternate pavement designs. The study reviewed best practices relating to length of analysis period, discount rate, (agency, user, and environmental) costs, economic criteria method, and computational approach for life cycle cost analysis. Based on the review, recommended practices for conducting LCCA in pavement design were identified and are proposed as input for a Standard Practice Guideline.

Comprehensive Business Case Framework for Evaluating Transit Projects

lun, 04/10/2017 - 17:59
Comprehensive Business Case Framework for Evaluating Transit Projects
by Johri,A; Routley,M.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5102 - INTERNET


Metrolinx is developing an evidence-based evaluation framework for business cases to inform investment decisions for transit projects. The Business Case Framework ensures that effective evaluation of options is conducted as a project advances through planning, design, delivery, and operation. The business case supports a systematic process of identifying, quantifying, and comparing expected benefits and costs of a project in a consistent and clear manner over its lifecycle. The work combines strategic and financial perspectives with the rigour of economic cost benefit analysis, while also incorporating operational issues and challenges.

20 Avenue Street Lab Party

lun, 04/10/2017 - 17:44
20 Avenue Street Lab Party
by Malzer,J.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5101 - INTERNET


The 20 Avenue N Street Lab Party was a first for Calgary – a public engagement trial using temporary materials to transform a street into a possible complete street configuration. This document describes the steps and tools that were developed to host the 20 Avenue N ‘Street Lab Party’. This project was initiated and completed in 2016. The City of Calgary hosted a Street Lab on August 20, 2016. The 20 Avenue N street lab party involved piloting street enhancements using tactical urbanism principles: inexpensive, quick, and temporary. The opportunity was intended to allow residents to participate in the planning and execution of the improvements to determine whether the benefits and drawbacks can be more fully assessed through experiences and observed data sets as compared with more traditional engagement approaches. This project was nominated for the TAC Sustainable Urban Transportation Award.

Bilan 2016 : accidents, parc automobile, permis de conduire

lun, 04/10/2017 - 17:18
Bilan 2016 : accidents, parc automobile, permis de conduire
2016.
CA2PQ DT_700 2016B31 - MAIN


Ce dossier statistique porte sur les accidents de véhicules routiers, les victimes, les titulaires d'un permis de conduire et les véhicules en circulation. Il présente le même type de reseignements statistiques que que les publications antérieures et couvre rétrospectivement une période globale de six ans.

Evaluation of Work Zone Throughput and User Delay Models

sam, 03/11/2017 - 21:11
Evaluation of Work Zone Throughput and User Delay Models
by Nikolic,G; Tighe,S; McCabe,B; Bhim,R; Rouhieh,B; Hadayeghi,A.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5130 - INTERNET


Lane closures on highways during construction results in reductions in capacity which ultimately leads to premature queuing and significant delay for road users. To minimize user delay costs, contractors are required to keep highway lanes open during the peak traffic hours and work during non-peak hours (typically nights). These limitations can reduce the quality of the work and extend project duration. To improve the efficiency of the work and reduce user delay costs, it is important to identify the factors that affect the capacity or throughput of a construction zone and attempt to design the construction zone to maximize the capacity. These factors can be categorized into a number of groups including design parameters of the workzone, traffic composition, time of day, geometry of the highway and presence of the police or construction related signs. In this study, several types of data was collected from various work zones on 400 Series Highway within Central Ontario under the jurisdiction of the Ministry of Transportation Ontario. The data include geometric data associated with a workzone, travel time/speed of vehicles approaching a workzone, volume of vehicles approaching a workzone and within the workzone, and the queue upstream of the lane closure locations. Utilizing the large data set collected, Multiple Regression Models (MRM) and Negative Binomial Models (NBR) were developed for the prediction of the throughput at work zones based on lane closure layout and geometric characteristics. In addition, a Simplified Work Zone User Delay Analysis (SZUDA) model was developed (building off the developed models), which calculates user delays by approximating queue lengths at work zones. The study also collected data and developed an Aimsun Microsimulation model to validate the regression model predictions. The results of this study can be used to develop a practical tool that provides a fast and efficient estimate of a workzone throughput during construction and calibrated to Canadian conditions.

Évaluation des sols d’infrastructure pour la conception des chaussées aéroportuaires en béton

sam, 03/11/2017 - 19:34
Évaluation des sols d’infrastructure pour la conception des chaussées aéroportuaires en béton
by Benkouar,M; D'Amours,L; Chevalier,F.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5129 - INTERNET


Les paramètres géotechniques nécessaires pour concevoir les chaussées sont l’épaisseur et les propriétés mécaniques, thermiques et hydrauliques des matériaux et des sols présents. La présente expertise, bien qu’ayant une portée limitée, semble indiquer que les indices CBR calculés lors des études préalables au moyen d’essais DCP dans les trous de forages devraient faire l’objet d’une correction pour considérer le confinement apporté par le remblai routier présent au-dessus de ces sols. Les indices CBR mesurés alors que le sol argileux est recouvert de remblai étaient surestimés de 25 à 30 % par rapport aux résultats, DCP et CBR in situ, mesurés sur le même dépôt exposé. 16 Le nombre d’essais effectués dans le cadre de ce projet ne permet toutefois pas de déterminer une relation ou un facteur de correction à appliquer systématiquement aux résultats mesurés lors de l’étude géotechnique. Un seul type de sol (argile silteuse) a été caractérisé et l’épaisseur du remblai routier était assez uniforme. La correction requise pourrait être différente de celle observée dans la présente étude si les conditions étaient différentes.

Establishment of Traffic Signal Policies and Procedures for Adoption on Saskatchewan’s Highway Network

sam, 03/11/2017 - 18:54
Establishment of Traffic Signal Policies and Procedures for Adoption on Saskatchewan’s Highway Network
by Steel,PHA; Holland,J.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5128 - INTERNET


The Saskatchewan Ministry of Highways and Infrastructure (the Ministry) completed a study in 2015 to expand their compliment of safety countermeasures along medium to high volume corridors and intersections. The report recommended to only consider the implementation of traffic signals where certain operational and safety conditions were met. The Ministry has not traditionally used signals at isolated, high speed rural intersection as a safety countermeasure because of the risk that collision severity will increase, in addition to compromising the intended mobility of these free-flowing major highway systems. Within this context, the Ministry retained Tetra Tech to assist in the development of policies and procedures for signal adoption. The policies will guide the Ministry to determine whether traffic conditions are/are not favourable to support signal implementation at locations under review. Policy statements were developed from current industry practices and from other jurisdictions’ guidelines and policy documents. A total of 13 statements were recommended to address: conditions where traffic signals could be considered, conditions where they may not be appropriate and other policy decision items. The current procedures adopted by the Ministry date back to 1989, and followed closely to the Transportation Association of Canada (TAC) guidelines of that time. As part of this latest initiative, Tetra Tech reviewed the current TAC procedures as well as other industry practices to confirm the approach that should be adopted that represents the Saskatchewan context. The recommendation for the Ministry was to adopt a hybrid of approaches used in North America jurisdictions that address the following: Achieving a minimum traffic volume for various time periods (eight-hour, four-hour and peak-hour volumes); Meeting a specific collision experience threshold that demonstrates under certain conditions, installing signals can benefit an intersection by reducing collisions of a high severity and type sufficiently to offset the increase in similar/lower severity collisions; Coordinated signal system to address adequate progression of vehicles along the main corridor; and Demonstrated improvement in the level of service and delay. This paper will present a summary of current industry practices, to discuss the establishment of policies and preferred warrants for adoption by the Ministry, as well as to provide the findings of a calibration check that applied the recommended policy statements and warrant procedures on four candidate intersections.

Effectiveness and Benefits of Calcium Chloride Stabilized Road Base: A Township of Woolwich Study

sam, 03/11/2017 - 16:07
Effectiveness and Benefits of Calcium Chloride Stabilized Road Base: A Township of Woolwich Study
by Duclos,A; Ambaiowei,D; Wheildon,L.
2017.
TAC 2017: Investing in Transportation: Building Canada's Economy - - 2017 Conference and Exhibition of the Transportation Association of Canada.
CA6 ARH_10 2017A5127 - INTERNET


Different additives (cementitious, bituminous, chemical, mechanical, biological, and proprietary blends) are routinely used to improve material properties of poor soils and aggregates ranging from highly expansive clays to more granular materials. Whereas the benefits of some of these additives are accounted for in pavement design and lifecycle processes; the benefits of Calcium Chloride (CaCl2) – a common chemical soil stabilizer is not considered. The hygroscopic properties of CaCl2 effectively stabilizes soils through the attraction of moisture and subsequent evaporation resistance, improving compaction during construction which in turn ensures a strong and durable base material. An additional benefit of CaCl2 particularly in cold regions, is its ability to decrease the freezing point of water consequently providing enhanced resistance to frost heaving. Leaning on the successes and challenges of calcium chloride stabilized road base in Canada, this on-going Township of Woolwich study investigates the effectiveness of a 35% CaCl2 road base application for improving the short and long-term performance of an asphalt surfaced roadway and reducing the overall life-cycle costs. This study employs a monitoring program of Falling Weight Deflectometer (FWD) testing - prior to and after base stabilization, after paving and after one winter cycle - to characterize the short and long-term benefits by comparing the performance of the CaCl2 stabilized and non-stabilized (control) road base sections exhibiting good and poor drainage conditions. This paper presents the short-term findings of using CaCl2 for base stabilization. The economic benefits of incorporating CaCl2 in road base applications is evaluated, and a case for considering the benefits of a CaCl2 stabilized road base during design is further assessed.