The major rehabilitation of the Red River Bridge on PR 305 included replacing the existing superstructure with a wider deck to accommodate pedestrians and increased traffic volumes. Strengthening and widening of the existing concrete substructures and foundations were performed to carry a new steel plate I-girder and CIP concrete deck. The continuity of the original bridge was altered and the existing abutments were modified to be semi-integral type to reduce the number of bridge expansion joints. The bridge construction staging maintained a single operating lane of traffic throughout construction.