Region of Durham utilizes Algonquin Modular Panel Temporary Bridge System to reconnect community of Beaverton, Ontario

Abstract

In November 2022, the Beaver River Bridge on Regional Road 15 in the community of Beaverton was closed following inspections that identified advanced deterioration of the concrete structure and concerns regarding its ability to safely carry traffic loads. To restore connectivity while advancing the
permanent bridge replacement, the Region of Durham implemented an accelerated program to design and construct a temporary crossing.

Following evaluation of several alternatives, a single-span modular panel bridge was selected due to its rapid deployment, constructability, and compatibility with the future permanent bridge works. A key aspect of the project was the integrated development of the temporary and permanent bridge
solutions. The temporary bridge alignment and foundation layout were designed to accommodate staged construction of the permanent replacement structure while maintaining traffic, minimizing potential rework and improving overall project efficiency.

Through close collaboration between the Region, Algonquin Bridge, and the Contractor, engineering, permitting, utility coordination, procurement, and construction activities were advanced concurrently to support the accelerated schedule. The resulting two-lane CL-625-ONT rated temporary bridge was successfully delivered within six months of project authorization and remains in service while construction of the permanent replacement bridge proceeds.

This paper describes the planning, design, and construction of the temporary bridge and highlights the benefits of modular bridge technology, collaborative project delivery, and early integration of temporary and permanent works. The project provides insight for municipalities responding to unexpected infrastructure closures while advancing long-term infrastructure renewal objectives.