Centre de ressourcesRecherche de ressources techniquesExposes Ecrits Du CongresRehabilitation of the Red River Bridge on PR 305

Rehabilitation of the Red River Bridge on PR 305

Abstract

Les exposés écrits du congrès ont été publiés dans la langue dans laquelle ils ont été soumis à l’ATC.

The major rehabilitation of the Red River Bridge on PR 305 included replacing the existing superstructure with a wider deck to accommodate pedestrians and increased traffic volumes. Strengthening and widening of the existing concrete substructures and foundations were performed to carry a new steel plate I-girder and CIP concrete deck. The continuity of the original bridge was altered and the existing abutments were modified to be semi-integral type to reduce the number of bridge expansion joints. The bridge construction staging maintained a single operating lane of traffic throughout construction.

Conference Paper Details

Titre de la séance:
Transportation Structures
Author(s):
Laffin, Rhys
Murison, Evangeline
Catégorie:
Ouvrages d’art (INF)
Année:
2026